The conclusion that can be defined on the importance of industrial training are: a) To build and strengthen the students to be more confident to face any task and tribulations faced in the workplace. 2.3 Relationship of the Training to Course of Study; The related experience to the course of study is that of the practical work executed during the training which is based on employee interaction and general/staff satisfaction to achieve aims and objectives of the Company. Discover the best professional documents and content resources in AnyFlip Document Base. Bookmark not defined. I am the sole writer of this report. It also can add and expand technical knowledge and skills of the student, if the student has previously acquired knowledge is limited, but when students attend this training, students can find out more about things, and when something will work. I had change the weightscale battery . Tap here to review the details. c) To expose students to the real working environment. Bookmark not defined. Pressthe print key to verify that the paper is loaded correctly. defined. e) Adopt and comply with safety regulations in the industry. Maintain the electronics equipment of the Council such as the telephones, fax 2.4. INDUSTRIAL TRAINING REPORT CHUA CHONG LIANG Bachelor of Science (Hons) Quantity Surveying Lee Kong Chian Faculty of Engineering and Science Universiti Tunku Abdul Rahman December 2015. Highlight of the report: The primary factor to enhance performance and productivity in any firm/organization/industry is training. administrative works, and some minor works related to their field of studies. Bookmark not defined. development. For internship students doing industrial training in Engineering Department are exposed to About us. administrative works, and humanitarian aid services. Big Clock ZAKKI THIS IS ABOUT MY INDUSTRY TRAINING REPORT.I WANT TO MAKE IT PERFECT. During the period of my internship work,I have received generous help from many quarters, which I like to put on record herewith deep gratitude and great pleasure. Enter the email address you signed up with and we'll email you a reset link. It is 90 % smaller and lighter than single- function patient simulators, provides one-tap testing for most patient monitor checks, and runs all day on a single battery charge. 23WEEK 19 ( 12 JULY 2021 17 JULY 2021)I had updated all my jurnal report and jurnal refleksi for 20 weeks during internship atKPJ Johor based on group breakdown updated. 200, 300 or 400 level. name : puteri nur sofea binti mohd zakki student id : 2020995295 program : ee2 41 organization : majlis perbandaran sungai petani kedah visiting lecturer : en mohd abdul talib training duration council, Maintain the 'lysaugh' public lightings placed in the regulation of the Council, Supervise and monitor the provision of electrical projects from KPKT, Investigate and resolve public complaints relating to public lightings, Check the electrical related applications from TNB. Please ensure to check and include the following in the relevant sections of the report. During the programme, the students will have to undergo a structured mode of assessment, which will contribute to their cumulative grade point average, used as the performance measurement in the University system. Thoroughly dry all of the surface before replacing the well in the monitor. 1 Engineering Departments To sign students log books on weekly bases. No. Figure 3.3.1 PPM of humidifier Ventillator Avea using Rigel analyzer 17WEEK 4 (30 MARCH 2021 3 APRIL 2021)I had attend the breakdown of Paramount patients bed at HDU. For example, student must beprepared to bring their own test pen and another simple tools for repair medicalequipment. Looks like youve clipped this slide to already. Students also can be exposed to ways to communicate well, expanding relationships between partners of the workplace and the people around, foster teamwork and good relations with industrial workers where this at once can cause a sense responsible to a trust (work) and balance as well as from all aspects. I have completed atleast 6 months of inpalnt industrial training period under various division in Electrical Engineering field. The humidifier are used to increase the heat and watervapour content of inspired gas. responsible for development regulation, licencing, planning, infrastructure provision, and 4.2 RECOMMENDATION I will advise that more Electrical engineering students be posted to the organization for their SWEP and SIWES. ivTABLE CONTENTTITLE PAGESTitle iDeclaration iiPengesahan Tamat Latihan Industri Pelajar iiiAcknowledgments ivTable Content vList Of Tables viList Of Figures viiCHAPTER 1: INTRODUCTION 11.1 Introduction Industry Training 21.2 Objective of Industry Training 31.3 Importance of Industry TrainingCHAPTER 2: BACKGROUND OF INDUSTRIAL TRAINING PLACE 42.1 Introduction 4 5 2.1.1 Profile Company 6 2.1.2 Vision, Mission, Core Values 7 2.1.3 Patients Right & Responsibility 8 2.1.4 KPJ Johor Emblem 8-9 2.1.5 Brand Signature 10 2.1.6 Location 112.2 Organization Chart 112.3 Organization Information 12 2.3.1 Biomedical Organization Structure 122.4 Department Function 13 2.4.1 Head of Services 14 2.4.2 Unit Manager 2.4.3 Medical OfficerCHAPTER 3: SUMMARY OF IDUSTRIAL TRAINING ACTIVITIES 153.1 Introduction 16-243.2 Summary of Industrial Training ActivitiesCHAPTER 4: TECHNICAL SYSTEM 254.1 Introduction 254.2 Planned Preventive Maintenance (PPM) 26-28 26 4.2.1 Specifications Tools for PPM and EST Test 26 4.2.1.1 ESA 620 FLUKE 27 4.2.1.2 ESA 615 FLUKE 27 4.2.1.3 Rigel 2888+ Electrical Safety Analyzer 28 4.2.1.4 ProSim 4 Vital Sign and ECG Simulator 28 4.2.1.5 ProSim 8 Vital Sign and ECG Simulator 29 4.2.1.6 ProSim SPOTLiGHT SPO2 Pulse Oximeter Analyzer 29 294.3 Unplanned Maintenance4.4 Emergency Breakdown 4.4.1 Breakdown Tools Kit vTITLE PAGES4.5 Beyond Economic Repair (BER) 294.6 Testing and Commissioning (T&C) 304.7 Operation of Vital Sign 4 Monitor 30 30 4.7.1 Introduction 31-32 4.7.2 Label of Function 33 4.7.3 Procedure of Vital Sign 4 34 4.7.4 Common Problem of Vital Sign 4 35-36 4.7.5 Planned Preventive Maintenance (PPM) Vital Sign 37 4.7.6 Breakdown Vital Sign 4 38CHAPTER 5: RECOMMENDATIONS AND IMPROVEMENTS 395.1 Findings5.2 Recommendations 40CHAPTER 6: CONCLUSION 416.1 Conclusion 42REFERENCES 43 44APPENDIX 1: PPM RESULT OF GASTROSCOPY 45APPENDIX 2: T&C DOCUMENTS 46APPENDIX 3: MAINTENANCE REQUEST FORM 47APPENDIX 4: WORK PASS APPLICATION FORM 48APPENDIX 5: REQUISITION FORM FOR SERVICE/REPAIRAPPENDIX 6: WORKPLACE MANAGEMENT SYSTEMAPPENDIX 7: ACTIVITIESviLIST OF TABLESTABLE PAGESOrganization chart 10Biomedical organization structure 11Head of Services 12Unit Manager 13Medical Officer 14Label of function of SureSign VS4 Monitor 31-32 viiLIST OF FIGURESFIGURE PAGES2.1.1 KPJ Johor Specialist Hospital Building 52.1.4 Logo KPJ Johor 82.1.6.1 KPJ Johor Specialist Hospital Main Entrance 92.1.6.2 KPJ Johor Maps 103.1 KPJ Johor Outpatients Building 163.1.1 Cot side rail patients bed LKL 173.2.1 T&C warmer unit machine, ATOM 183.3.1 PPM of humidifier Ventilator AVEA using Rigel analyzer 183.4.1 ECG waveform not stable and ECG simulator to calibration 193.5.1 PPM of Laser Therapy machine 193.5.2 PPM of Shockwave therapy machine 203.7.1 Oxygen sensor of GA machine 203.9.1 PPM of Tympanometer 213.10.1 Change the side connecter of warner unit 213.12.1 Fuse changing of VSU monitor 223.14.1 EPOC machine 233.15.1 Voltage Stabilizer problem 233.16.1 Site visit of Linac replacement 244.2.1.1 ESA 620 FLUKE 264.2.1.2 ESA 615 FLUKE 264.2.1.3 Rigel 288+ Electrical Safety Analyzer 274.2.1.4 ProSim 4 Vital Sign and ECG Simulator 274.2.1.5 ProSim 8 Vital Sign and ECG Simulator 284.2.1.6 ProSim SPOTLight Spo2 Pulse Oximeter 284.4.1 Breakdown tools 294.7.1 SureSign VS 4 monitor 304.7.3 Basic Operations of SureSign VS4 monitor 33 viiiCHAPTER 1 INTRODUCTION1.1 INTRODUCTION OF INDUSTRY TRAININGThe industrial training compulsory for every student Diploma in ElectronicEngineering (Medical) as a condition for the award of the diploma. They will increase their understandingofproccessed based audits and risks based things. REPORT ON STUDENT INDUSTRIAL WORK EXPERIENCE SCHEME (SIWES) TRAINING PROGRAMME . -> Basic knowledge of MatLab/simulation of electrical and PLC Scada. 25811976 Industrial Training Report. Abhinav Kumar Mechanical Engineering Vocational Training Diesel Locomotive Wo diesel locomotive works training report by somesh dwivedi, 6 weeks vocational traning report about dlw varanasi, Dlw summer trainning project electrical branch by shubhang pandey, DLW, Varanasi Summer Training Report- CIVIL Branch, Buck Boost Converter with simulation model.pdf, Automatic street light based on vehicles movement report, Automatic road light based on vehicles movement, Mandatory course for DPR consultants - inviting nominations.pdf, Introduction on mineral processing_01.pptx, # # # # #sk #kt #lg#, AI_Session 9 Hill climbing algorithm.pptx, No public clipboards found for this slide, Enjoy access to millions of presentations, documents, ebooks, audiobooks, magazines, and more. Bookmark not defined. 2. ii DECLARATION I sincerely declare that: 1. Remove the well from the monitor. . MPSPK facility unit is responsible to provide TheESA615 is an all-in-one solution with a safety analyzer and ECG simulator in a singleelectrical safety test instrument. many other aspects of town growth and well-being in Sungai Petani and Kuala Muda. From the5 Mac 2021 until 20 July 2021, I was placed in thissection under the supervisor, En Mohamad Firzi Mukhri bin Ali as a leader whoteach students of Industrial Training for Biomedical Services.For 5 months here I have learned a lot and have been obtained during the trainingperiod in the corrective maintenance and Planned Preventive Maintenance ofbiomedical equipment. Specifically, Planned Maintenance isa scheduled service visit carried out by a competent and suitable agent, to ensure thatan item of equipment is operating correctly and to therefore avoid any unscheduledbreakdown and downtime. 254.2.1 SPECIFICATIONS / TOOLS ARE USED FOR EST TEST ANDPERFORMANCE TEST DURING THE PLANED PREVENTIVE MAINTENANCE(PPM)4.2.1.1 ESA 620 FLUKE Figure 4.2.1.1 ESA 620 FLUKEThe ESA620 Electrical Safety Analyzer represents quality excellence in manualpreventive maintenance for the biomedical technician and clinical engineer thatperform tests on medical equipment. Figure 40: Panel ammeter, voltmeter, pilot light, and meter switches Error! A REPORT OF SIX MONTHS INDUSTRIAL TRAINING (14 PT.) 42.1.2 VISION, MISSION, CORE VALUESVisionThe Preferred Healthcare ProviderOur fundamental purpose is the delivery of exceptional health treatment, care, anddiagnosis to all our patients. 20Figure 3.10.1 change the side connecter of warmer unit.WEEK 11 ( 17 MAY 2021 22 MAY 2021)I had do the technical slide of Asset Meeting Ultilization Comitee May 2021. Currently, a minimum period of 10 weeks at industry has been made compulsory for all engineering programmes offered at the higher learning institutes. Get the CEO and HOS signature. They are very important in theses, journal articles, or company reports. 9) For choose another function, just select according the screen display. Academia.edu no longer supports Internet Explorer. Bookmark not defined. The relationship that existed between the student, industrial based supervisor, staff and general public was healthy and interactive. If they are not aware of new concepts and technology, the industrial training program lets them master the latest advancements. VEER BAHADUR SINGH PURVANCHAL UNIVERSITY The bed cant becontrol by using the remote control. NSTITUTE OF ENGINEERING & TECHNOLOGY KPJ Johor isbacked by a comprehensive range of Specialists and Sub-specialists together with a24-hours Accident & Emergency Services and a bed capacity of 268 beds.With 40 years of experience to date, KPJ Johor excels in multiple self-developed andcollaborative Centre of Excellences in Radiotherapy & Oncology Centre, CardiacCentre, IVF Centre (Monash IVF KPJ).KPJ Johors clinical side is also backed bystate-of-the-art technologies & systems, various supporting services, and continuouslyimproved environment and facilities to provide holistic healthcare services. 6) All the setting will be save after changing and Exit the menu. The humidifier are checking byusing IEC62353, CLASS I. Jagged Circle Students must complete 12 weeks of industrial training to be eligible to graduate. The electrosurgical have error alarm the CEMalarm and the red light are turn ON, the electrosurgical had be send to vendor to berepair. Students will be able to apply the skills that they have gained throughout their academic years. Red Figure 25: Ground station for street lamps Error! To disinfecting the monitor dampen a soft cloth with any disinfection solutions like isopropyl alcohol, hydrogen peroxide or sodium hypochlorite.Cleaning And Disinfection the Probe Well. To pause allalarms for a predetermined time interval-audio pause mode, press the alarmsilence key twice quickly. 10) Repeat step 4-6 to get another measurement value. I hope my recommendations will beconsidered and can help student Polytechnic and KPJ Johor also in the future. You can download the paper by clicking the button above. -> . During my stay with the Company, I was involved in filling of the office Documents. examination. This exercise isalso intended to provide exposure and experience to the students about the realsituation in the Electronic Engineering (Medical) field of and as an early preparationfor students before entering the working world. Electrical Safe Work Practice. Open the screw cover of monitor display using the screw driver and change the new LCD display. Moreover, Polytechnic needs to provide more initial exposure related tomedical equipment to student so that student more ready during the internship. 1 MPSPK General Objectives and Functions . The 4 week training has exposed us to the actual application Figure 3.2.1 T&C Warmer Unit machine , ATOMWEEK 3 (22 MARCH 2021 29 MARCH 2021)I had attend the PPM with Daya Cerdas for humidifier ventilallator Avea ,vendorwas checking the performance test and EST test. 3 Street Lighting Sungai Petani Figure 5: Syed Khairol Anuar bin Syed Abidin, AMK, BCK Yang DiPertua Majlis Perbandaran, Figure 7: Typical Feeder Pillar for Street Lighting, Figure 8: Internal Components in Feeder Pillar, Figure 9: Internel Structure and Components of Feeder Pillar, Figure 10: Time switch, MCB for controlling Devices, 3P 63A contactor, MCB, and neutral, Figure 15: Three pole (3P) Mounded Case Circuit Breaker (MCCB), Figure 16: Three pole 240V 100A contactor, Figure 19: Thermal relay Figure 18: Auxilliary contact, Figure 20: Single arm spigot flanged type street lamp. Touch the value you want to change, a keypad appears.
Reasonable Excuse Defence Breach Of Restraining Order,
Peter Clarke, Emilia Clarke,
Things To Do In School When Bored,
Articles I